← AC9TDE10P05 Develop project plans for time, cost, risk and production

Collaborative planning with equitable role distribution

AC9TDE10P05 n2 · waypoint 2 of 3 · Years 9–10 Design and Technologies · Processes and production skills

Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.

Checkpoint

Students can collaboratively develop a production plan with equitable distribution of roles, tasks and deadlines, including flexibility and contingencies.

Make a primer for this
Opens Create with a Primer starter: title, goals from the success criteria, the misconception and width suggestions to choose from. Nothing is published until you send it in.

Lessons on this site

None yet.

Success criteria

Prior knowledge

Waypoint 1: Planning and interpreting production timelines.

Width

Minimum
In a collaborative project, assign roles and tasks to all team members with deadlines; identify at least one contingency if a task is delayed or a person is unavailable.
Typical
Collaboratively develop a production plan that distributes work equitably — assign roles and tasks based on skills and availability; discuss and agree on deadlines and flexibility; build contingencies for foreseeable risks; monitor and adjust the plan as the project progresses.
Wider
  • Reflect on the equity of role distribution in a completed collaborative project — evaluate whether the plan achieved equitable contribution and what changes would improve future plans
  • Develop a contingency plan that addresses at least three distinct risks (material, personnel, timeline) — test the contingency plan by simulating a specific risk event
  • Investigate how professional design and manufacturing teams structure equitable collaboration — identify what practices could be applied to student projects

Kit node file for AC9TDE10P05 (JSON; this waypoint is node 2)

Descriptors: Australian Curriculum v9 (ACARA, CC BY 4.0). Waypoints, success criteria, width and response modes: Waypoints Kit v0.2 (CC BY-NC-SA 4.0), waypoints-kit 834ceb8. Corrections go to Kit, not this site.