Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.
develop project plans for intended purposes and audiences to individually and collaboratively manage projects, taking into consideration time, cost, risk, processes and production of designed solutions
Students can develop project plans to individually and collaboratively manage time, cost and production (AC9TDE8P05). They have experience with sequencing and tracking tasks. They have not yet developed plans for specific intended purposes and audiences, incorporated formal risk and contingency planning, or investigated manufacturing process strategies for production enhancement.
Students develop project plans for intended purposes and audiences that manage time, cost, risk, processes and production of designed solutions — including flowcharts, spreadsheets, equitable role distribution, contingencies, and production enhancement strategies.
Examples from ACARA that illustrate this standard. They are examples, not a checklist, and belong to the standard as a whole.
Kit node file for AC9TDE10P05 (JSON)
Descriptors: Australian Curriculum v9 (ACARA, CC BY 4.0). Waypoints, success criteria, width and response modes: Waypoints Kit v0.2 (CC BY-NC-SA 4.0), waypoints-kit 834ceb8. Corrections go to Kit, not this site.