Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.
Students can produce, explain and interpret drawings and production timelines using digital tools for a design project.
Make a primer for this
Opens Create with a Primer starter: title, goals from the success criteria, the misconception and width suggestions to choose from. Nothing is published until you send it in.
None yet.
Students can develop project plans to individually and collaboratively manage time, cost and production (AC9TDE8P05). They have experience with sequencing and tracking tasks. They have not yet developed plans for specific intended purposes and audiences, incorporated formal risk and contingency planning, or investigated manufacturing process strategies for production enhancement.
A production plan that cannot be interpreted by collaborators makes N2 equitable role distribution impossible — if the timeline and task structure are unclear, team members cannot negotiate distribution or identify their responsibilities.
Where extra effort goes at this waypoint (width), not what kind of lesson it is.
Kit node file for AC9TDE10P05 (JSON; this waypoint is node 1)
Descriptors: Australian Curriculum v9 (ACARA, CC BY 4.0). Waypoints, success criteria, width and response modes: Waypoints Kit v0.2 (CC BY-NC-SA 4.0), waypoints-kit 834ceb8. Corrections go to Kit, not this site.