← Teacher guide

Choose a chart

Students choose a chart type to answer a question (column to compare groups, line for change over time, scatter for two measurements, pie for parts of a whole) and give it a title and axis titles with units. They chart a cooling cup of water, animal lifespans, arm span against height and how a day is spent, and repeat it in the spreadsheet app the school uses.

Working with data · Show the data · about 50 minutes · Open the student lesson

Classroom resources

Open these in Waypoints Prepare with one click. To share a file another way, copy its address and paste it into Load URL, or download the file and import it. In Prepare, the worksheet's Teacher edition shows the answers; the student copy hides them.

Students will be able to

Timing

Predict and Try 10 min · Worked example 10 min · Vary 7 min · Practise 12 min · Make and own app 11 min

Before class

Do the Try board yourself: build the line chart, then change the type to Pie and Column and ask what each hides.

The one idea: the question decides the chart. Column: compare groups. Line: change over time. Scatter: do two measurements go together. Pie: parts of one whole.

On the page, students type the ranges (Labels and Values) rather than drag over the cells, because the principle is the same in every app: the chart needs labels and values. For a scatter chart, the Labels box holds the numbers for the horizontal axis, as in most apps' 'X values'.

Honest charts: column charts start at 0. A pie of unrelated numbers is meaningless. Titles and axis titles with units mean the chart stands alone. 3D effects and decoration are left out on purpose.

The values in the animal and arm span tables are rough, for teaching. Use class data if you have it, and have students predict what the scatter will look like before they build it.

Running the lesson

  1. Predict: students who chose pie think any numbers can be a pie. Ask what the whole would be.
  2. Try: ask what the chart tells them that the table does not, and which type hides it.
  3. Worked example: ask what each of the four charts is for, in their own words.
  4. Practise: ask which axis each measurement goes on in the scatter and why it matters little which is which.
  5. Own app: walk round. Common slips: selecting the heading row as a value, and leaving the title as 'Chart 1'.

In class

On the slides at these points. Students can do the whole lesson on their own; these are for the room. In the deck, the Run, Modify and Make slides have the live playground in them (the tutorial link is the backup), and the notes above are in each slide's speaker notes.

The hard part (on purpose)

Picking the chart from the data instead of from the question. Students click whichever picture looks nicest. Ask 'what do you want the reader to see?' before they touch the type.

When students get stuck

What you will seeA question to askThe fix
A student makes a pie of the temperatures (Sam's mistake).What is the whole that the six slices share out?Change to a line chart: the temperatures follow each other in time.
A scatter chart shows an error or nothing.Are both boxes numbers? Which box holds the horizontal axis?Labels is the horizontal numbers (arm span) and Values is the vertical numbers (height).
A chart has no title or axis titles.Could someone who has not seen the table tell what it shows?Add a title and name both axes with units.
A student's pie has a negative or empty slice.Can an amount of time or a count be less than zero?Check the cells hold positive numbers.

Answers to the checks

  1. which chart?: You want to show how the water's temperature changes as the minutes go by. Which chart shows it best?
    A line chart. The points follow each other in time, and a line joins them so the eye sees the water cooling and how fast. A pie chart is for parts of a whole, which temperatures are not.
  2. Try: make a line chart: Make a line chart of the temperature (values B2:B7) against the minute (labels A2:A7). Give it a title and both axis titles.

    A line chart of six points, titled and with both axes named, shows the water cooling and how quickly it slows down.
  3. Four charts: A class counted how many beans were in each of four size groups. Which chart compares the four counts best?
    A column chart
    Separate groups with a number each are compared with a column chart: the height of a column is the size of the count.
  4. Find the mistake: Sam's chart does not show the water cooling. Click the line where Sam first goes wrong.
    line 2
    Line 2: a pie chart shows parts of one whole, and six temperatures are not parts of anything. The slices look nearly the same and the cooling disappears. A line chart was the right choice.
  5. What is missing?: Sam's column chart of the animals' lifespans has no title and no axis titles. What is the reader missing?
    What the columns measure, and in what units
    A title says what the chart is about and the axis titles say what each axis measures, with units such as years or °C.
  6. Do they go together?: You measured the arm span and the height of eight people. You want to see whether people with longer arm spans are also taller. Which chart do you use?
    A scatter chart
    A scatter chart puts each person at one dot, arm span along and height up. A pattern in the dots shows whether the two go together.
  7. What share?: A pie chart shows how 20 hours are spent. One slice is 5 hours. What percentage of the pie is that slice?
    25
    5 out of 20 is a quarter, which is 25%.
  8. A cut-off axis: A column chart's vertical axis starts at 50 instead of 0, so a column of 52 looks twice as tall as a column of 51. What does that do?
    Makes a small difference look big
    A column's height should show its size, so the axis for columns should start at 0. Starting higher exaggerates small differences.
  9. Axis title: What should the vertical axis title of a chart of the water's temperature say?
    Temperature (°C)
    Say what is measured and the unit: Temperature (°C).
  10. Column chart: Make a column chart of the animals' lifespans, with a title and both axis titles.

    The chart has eight columns, one per animal, with the lifespan in years up the side, a title, and both axes named.
  11. Scatter chart: Make a scatter chart with arm span along the bottom (B2:B9) and height up the side (C2:C9). Give it a title and both axis titles.

    Each dot is one person, with arm span along and height up. The dots rise in a line, so people with longer arm spans are taller.
  12. share a day: Type how you spend your 24 hours (in B2 to B7, adding up to 24). Choose the chart that shows how a whole is shared and give it a title.

    A pie chart of the six activities shows how one day is shared out, and the parts add up to 24 hours.

Solutions

One possible solution for each task. Other correct programs are fine.

share a day

Open task: any program that does what the step asks.

Stretch and support

Stretch: Make a chart that could mislead (cut the axis, or choose the wrong type) and swap with a partner. Can they say what is wrong with it?

Support: A card: column compares groups. Line shows change over time. Scatter shows two measurements together. Pie shows parts of a whole. Title and name both axes.

Exit ticket

A student measured how far a ball rolled after being released from five different heights. Which chart shows whether a higher release goes with a longer roll?

A scatter chart: release height along the bottom and distance rolled up the side. Each dot is one roll.

What each step is for

Where it leads

Next in Working with data: the challenge, Report on an investigation.

Maths: scatter charts and lines of best fit in Years 7 and 8 statistics. Science: graphs of an investigation (the independent variable on the horizontal axis).