← Teacher guide

Putting it together: a water plan for one town

Students join the course in one explanation for one place: a made-up town, Tarnbridge, in the real Murray–Darling Basin, with a made-up evidence pack. They diagnose the causes before choosing a strategy, check who else is affected, and use distribution, variability, scarcity and sustainability accurately. More than one strategy is defensible, so the final explanation is read by a partner or the teacher, not marked.

Water in Australia · Water in Australia · about 45 minutes · Open the student lesson

Classroom resources

Open these in Waypoints Prepare with one click. To share a file another way, copy its address and paste it into Load URL, or download the file and import it. In Prepare, the worksheet's Teacher edition shows the answers; the student copy hides them.

Students will be able to

Timing

Think first and Try 6 min · The idea 12 min · Vary 7 min · Check 5 min · Apply 15 min. Typical and wider steps are extras.

Before class

This is the integration node (K02 n5). The node's first criterion asks for "a specific Australian water context". Tarnbridge is made up so that its evidence can be clear and nothing dates or leans, but it sits inside the real Murray–Darling Basin, and the only real facts used are the Basin's definition and that it covers parts of NSW (Bureau of Meteorology, National Water Account). Say this aloud: the place is invented; the Basin is real. A teacher who wants a fully real case can swap in their own catchment, with sources. What is real and what is made up, against the node's first criterion ("a specific Australian water context"): the distribution part is real (the Basin, its states and rivers on the lesson map, and the Vary sort and Make step ask students to name them); the implications and strategy are practised on made-up evidence, so they are not claims about any real Basin town.

The node's wider item, a Murray–Darling Basin case with the Basin Plan and water trading, is not used in student steps: it is contested and its details date. If your class goes there, present it as competing views with dated sources, not as settled.

Shape: primer, so the stages read Think first, The idea, Check and Apply. The lesson is mostly weighing and explaining. Only the diagnosis, the order of parts, the meanings of terms and recognisable errors are marked; the strategy choice is open.

Running the lesson

  1. Think first: vote, then ask what the evidence pack says is causing the shortage.
  2. The idea: list the causes from the evidence on the board before the bug task.
  3. Vary: check each word's meaning against an example from the case.
  4. Apply: accept different strategies if the four parts are there and a cause is targeted.

In class

On the slides at these points. Students can do the whole lesson on their own; these are for the room. In the deck, the Run, Modify and Make slides have the live playground in them (the tutorial link is the backup), and the notes above are in each slide's speaker notes.

The hard part (on purpose)

Students reach for a strategy first, usually the pipeline in the case. Ask 'What is causing this?' and 'Who else uses this water?' before any strategy is named.

When students get stuck

What you will seeA question to askThe fix
The plan starts with the pipeline.What is causing the shortage? Would the pipeline fix the leaks?Diagnose from the evidence first, then choose.
'Sustainable' is used to mean 'there is water now'.Would this still work in five dry years, with more people?Sustainable means meeting needs without running the source down.
The explanation leaves out other users.Who else uses the river? What happens to them?Name the farms and the wetland, and what they would get.

Answers to the checks

  1. Think first: strategy or diagnosis first?: What should Tarnbridge decide first?
    Diagnose first. The evidence shows several causes: dry years, a leaking dam and growing use. A strategy should target them, and its effects on others should be checked.
  2. Try: the four parts: Match each part of Tarnbridge's plan to its place in the order.
    First → B. Where Tarnbridge's water comes from, and where it is in Australia; Second → D. What the shortage means for people in Tarnbridge; Third → A. Why the water is hard to keep going; Fourth → C. How a strategy targets the cause
    Distribution, then implications, then why sustainability is hard, then the strategy.
  3. Diagnose Tarnbridge: What is causing Tarnbridge's shortage, going by the made-up evidence?
    Several things at once: dry years, a leaking dam and growing use
    Tarnbridge has a physical cause (dry years), an economic cause (the leaking dam) and a cause from the ways water is used (growth), with other users downstream.
  4. Find Nib's slip: Nib is writing Tarnbridge's plan. Click the first line where Nib's thinking goes wrong.
    line 2
    Line 2: Nib picks the pipeline before diagnosing the causes. The leaking dam and growing use would still be there, and the catchment the water comes from would get less.
  5. Words for the plan: Match each word to its meaning.
    Distribution → A. How water is spread across places; Variability → B. How much the amount of water changes over time; Scarcity → D. Not enough usable water for what people need; Sustainability → C. Meeting needs now without running the source down
  6. After the repair: Tarnbridge fixes its leaking dam. Which part of its problem is still there?
    Dry years and growing use, with others sharing the river
    One strategy rarely targets every cause. A plan may combine them.
  7. The real Basin: Use the map. Is each river in the Murray–Darling Basin, where Tarnbridge is?
    The Murray River → In the Basin; The Darling River → In the Basin; The Lachlan River → In the Basin; The Ord River → Not in the Basin; The Burdekin River → Not in the Basin
  8. Check: a strong explanation: Which explanation of made-up Tarnbridge is strongest?
    In the Basin, Tarnbridge runs short in dry years as use grows; fixing leaks and using less target those causes, but sharing the river makes it hard to sustain
    The strongest explanation covers distribution, implications, why it is hard to sustain and a strategy that targets the cause.

Stretch and support

Stretch: Test your plan against a run of very dry years and a doubling population. Same level, more width.

Support: Give the four-part frame on a card: Where → What it means for people → Why it is hard → Strategy and the cause it targets.

Exit ticket

For a place you have not studied (your own town, or a made-up one), name where its water comes from, one implication for people, and one strategy that targets a cause.

Answers vary. Look for a source and its place, a consequence for people, a named cause, and a strategy that targets that cause.

What each step is for

Where it leads

This is the last lesson in Water in Australia. Next in the Water and places pathway: What water is worth (AC9HG7K03), coming later.

First Nations content: none of ACARA's elaborations for AC9HG7K02 names a First Nations example. If you add First Nations perspectives on water in the Basin, use First Nations-led sources and local, community-approved material.

ACARA endpoint for AC9HG7K02: "Students explain the location and distribution of water resources in Australia, their implications for people, and strategies to manage water sustainability."

Sources