← AC9TDE8P05 Manage time, cost and production

Managing risks during production

AC9TDE8P05 n4 · waypoint 4 of 6 · Years 7–8 Design and Technologies · Processes and production skills

Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.

Checkpoint

Students can apply planned risk mitigation strategies during production and respond to unexpected hazards as they arise.

Make a primer for this
Opens Create with a Primer starter: title, goals from the success criteria, the misconception and width suggestions to choose from. Nothing is published until you send it in.

Lessons on this site

None yet.

Success criteria

Prior knowledge

Waypoint 3: Identifying project risks and contingencies.

Width

Minimum
Apply at least one planned mitigation strategy during production; identify and respond to at least one unexpected hazard.
Typical
Apply risk mitigation strategies consistently throughout production; manage workspace hazards as they arise; document any unexpected risks encountered.
Wider
  • Compare how planned vs actual risks differed — what hazards emerged that weren't anticipated?
  • Evaluate whether planned mitigation strategies were effective or needed adjustment during production.

Response modes

Where extra effort goes at this waypoint (width), not what kind of lesson it is.

Consolidation: more practise steps, short feedback loopsManaging risks during production requires consistent application of safe practices — PPE, workspace management, equipment handling. Repeated practice across production tasks builds the automatic habit.

Related standards

AC9TDE8P03 Justify production choices

Kit node file for AC9TDE8P05 (JSON; this waypoint is node 4)

Descriptors: Australian Curriculum v9 (ACARA, CC BY 4.0). Waypoints, success criteria, width and response modes: Waypoints Kit v0.2 (CC BY-NC-SA 4.0), waypoints-kit 834ceb8. Corrections go to Kit, not this site.