AC9TDE8P05 n2 · waypoint 2 of 6 · Years 7–8 Design and Technologies · Processes and production skills · Hinge
Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.
Checkpoint
Students can estimate time allocations for production stages, track costs, and organise schedules using planning templates or digital tools
Make a primer for this Opens Create with a Primer starter: title, goals from the success criteria, the misconception and width suggestions to choose from. Nothing is published until you send it in.
Lessons on this site
None yet.
Success criteria
Creates a plan with at least three steps, time estimates and responsibilities
Plan is organised using a template or digital tool
Create a plan that includes at least three production steps with time estimates and identifies who is responsible for each
Typical
Use a planning template or digital tool to record tasks, time estimates, critical dates and responsibilities; estimate time allocations using prior knowledge, research and testing; track costs against a budget
Wider
Use digital project management tools to track tasks, resources, expenses and deadlines across a complex project
Estimate and compare time allocations for different production stages — then compare estimates against actual time to improve future planning
Hinge
Time and cost estimates from this node feed directly into Node 3 risk planning — without realistic time allocations and budget tracking, students cannot identify which stages are at risk of overrun or resource constraint, making the risk register at Node 3 speculative rather than evidence-based.
Response modes
Where extra effort goes at this waypoint (width), not what kind of lesson it is.
Context breadth: more contexts in the vary or modify stepTime and cost management applies differently across different production types — textile projects, food production, engineering systems each have different time profiles and cost structures. Students who only plan for one production type develop planning habits that do not transfer. Seeing how time and cost variables behave across different production contexts builds transferable planning skill.
Descriptors: Australian Curriculum v9 (ACARA, CC BY 4.0). Waypoints, success criteria, width and response modes: Waypoints Kit v0.2 (CC BY-NC-SA 4.0), waypoints-kit 834ceb8. Corrections go to Kit, not this site.