← AC9TDE6P05 Develop project plans and resources

Identifying resources and allocating roles

AC9TDE6P05 n2 · waypoint 2 of 2 · Years 5–6 Design and Technologies · Processes and production skills

Draft, from Waypoints Kit v0.2. Generated from Kit's node data and not yet reviewed by a specialist in Design and Technologies: treat it as a starting suggestion and check it before use.

Checkpoint

Students can identify the human resources, materials, tools and equipment needed for a project and specify when each is needed — allocating roles to team members

Make a primer for this
Opens Create with a Primer starter: title, goals from the success criteria, the misconception and width suggestions to choose from. Nothing is published until you send it in.

Lessons on this site

None yet.

Success criteria

Prior knowledge

Waypoint 1: Planning production steps and sequencing tasks.

Width

Minimum
Identify at least three types of resources needed for a project (human, materials, tools) and specify when each is needed in the production sequence
Typical
Develop a project plan that identifies human resources, materials, tools and equipment with timing — setting milestones, allocating roles to team members, and specifying when shared resources need to be scheduled; include document sharing permissions when collaborating digitally
Wider
  • Set milestones for a collaborative project — using a shared digital document or spreadsheet to list tasks, deadlines and team roles; configure document sharing permissions appropriately for the team
  • Plan access to a specialist resource (e.g. a wildlife expert at the planning stage, shared tools during construction) — explaining when in the production sequence this resource is needed and what constraints it creates
  • Develop a project plan for a habitat-building project for local animals — identifying all resource types needed at each phase and the timing constraints between resource availability and production steps

Response modes

Where extra effort goes at this waypoint (width), not what kind of lesson it is.

Integration: a combining task at the wider tierResource planning integrates the task sequence from node 1 with the knowledge of what each task requires. The integration act is aligning resource availability with task timing — if a resource isn't available when needed, the plan must adapt. Students who plan tasks and resources separately have not yet integrated them.